Specifications include, but are not limited to: The project consists of a shallow, medium-sized slide, extensive mud and drainage around and under home, threat of large trees falling towards home from slide area and drainage issues on the existing mining bench above. The project includes one (1) waste area approximately one (1) acre in size and located along an existing mine bench, above the home. An existing dirt road runs parallel to the base of the highwall. Some trees have grown within the road and may need to be removed, but most are small in diameter. Trees and brush will be windrowed off to the side. A subdrain will be installed at the base of the highwall to alleviate existing drainage issues and daylight into an adjacent natural drain where a 4' F.B. Class III ditch will be installed. Excavated material will be placed against the highwall and graded at a 2:1 slope. The existing access road will be left in place for the landowner but may need to be moved accordingly, after waste material is backfilled. An ECB diversion ditch will be installed at the top of the transition zone and along the disturbed access road. It will daylight into the installed Class III ditch at whatever elevation is determined by the onsite Engineer during construction. Location may vary depending on final grade.