Specifications include, but are not limited to: 1. GENERAL a. The work covered by this Request for Quote consists of the furnishing of all labor, equipment, devices, tools, materials, transportation, professional services, supervision, drawings, permitting, and all miscellaneous requirements to perform all operations necessary to accomplish the work set forth below and shall be considered part of the Scope of Work. b. Please reference the Annual Contract – HVAC for additional requirements. c. Work is to be completed during the hours of 7:30 a.m. to 5:00 p.m., Monday through Friday. d. Contractor shall contact the Project Manager within seventy-two (72) hours of notice to proceed to establish scheduling, etc. required for project implementation. e. Work to be completed within two hundred seventy (270) calendar days from Notice to Proceed. Permit application, if required, is to be submitted by Contractor within five (5) days of “Notice to Proceed” and due diligence exercised to address all Building Department comments. f. Liquidated damages will accrue in the amount of $120 per day. g. The Contractor will provide a Certificate of Occupancy or Certificate of Completion, as appropriate, obtained from the proper Building official, prior to processing of final payment. h. Contractor is responsible for obtaining all measurements during the site inspection 2. SCOPE OF WORK To replace HVAC units per the project requirements provided in the engineer’s drawings and specifications. (See Exhibit “1”). 3. PRODUCT INFORMATION Design basis for all equipment specified in this contract is manufactured by Trane; substitutions require owner’s prior written approval. Provide, to the Project Manager, all equipment and material cut sheets and manufacturer’s project data for all equipment and components for acceptance by the County prior to ordering.