Specifications include, but are not limited to: Central Energy Power Plant - 3911 E Wu Shock Dr. o Chill Water Make-up Close Loop for 1 year 98,512 gallons o Boiler Make-Up for 1 year 786,783 gallons o Cooling Tower Make-Up approx. 12,000,000 gallons for 2 towers per year o Boilers and Cooling Towers typically run 12 months out of the year. Boilers number of hours of operation • 1 boiler runs 24/7/365 • 2 boilers run 3 months a year Cooling towers number of hours of operation: Summer-24; Spring-15; Winter-5-10; and anytime the outside temperature is above 45 degrees. o Bottom Boiler blown down twice a day for 10 seconds, surface boiler automatically blown down by TDS meter o Estimated percent condensate return to the steam boilers is 90% o Fully functional deaerator. John Bardo Center – 1800 Innovation Blvd. o Cooling Tower Holds approx.1700 gallons each, typically runs 10 months per year. Chillers are 274 Tons AAON LZA-274-E-3-FHD0E-0000 Serial 201601-BBCV00009 AAON LZA-274-E-3-FHD0E-0000 Serial 201601-BBCV00010 Cooling towers are run anytime outside temp is above 50 and typically run 12 months out of the year. Shocker Hall – 2020 Perimeter Rd. o Cooling Tower Manufacturer: Baltimore Aircoil Company Size: 270 nominal tons Holds approximately 3500 gallons, typically runs 9 months per year. o Boilers Domestic Hot Water (quantity 2) Manufacturer: Lochinvar BTU: 1,706,000 Type: Hot water system Holds approximately 1,706,000 gallons, typically runs 12 months per year. o Heating (quantity 3) Manufacturer: Crest BTU: 1,500,000 Type: Hot water system Holds approximately 1,500,000 gallons, typically runs 6 months per year.