Specifications include, but are not limited to: Demolition 1) Remove all existing shingles, felt, flashing and nails from roof area. 2) Remove all vinyl siding and nails. 3) Contractor shall be responsible for disposing of all debris off park property. Siding: 1. The Installation of all new fiber cement material and non-woven house wrap shall be installed according to the manufacture’s installation requirements. The contractor shall be responsible for staying within the spacing requirements of the manufacture’s recommendations. 2. The contractor shall install in a board and batten pattern with battens at 12 inches on center with horizontal band board as required. 3. The contractor shall be responsible for the installation of flashing over the doors, windows, heating ducts, and where siding meets the ground around the bottom of the wall. The flashing will have a z-bar shape and have a hem or crimp on the outside edge.