Specifications include, but are not limited to: the installation of a 5,600 linear foot multi-use pathway with 1,200 linear feet of appurtenant sidewalk. 1 L.S. Clearing and Grubbing, per Lump Sum 2410 C.Y. Earth Excavation, per Cubic Yard 70 C.Y. Rock Excavation, per Cubic Yard 2 Ea. Test Pit, per Each 40 S.Y. Removal of Concrete Sidewalk, per Square Yard 3300 L.F. Cut Bituminous Concrete, per Linear Foot 720 S.Y. Removal of Bituminous Concrete, per Square Yard 6520 S.Y. Formation of Subgrade, per Square Yard 280 C.Y. Subbase, per Cubic Yard 3 C.Y. Granular Fill, per Cubic Yard Sedimentation Control System, per Linear Feet 21 Ea. Sedimentation Control System at Catch Basin, per Each 125 C.Y. Rock in Drainage Trench Excavation 0’-10’ Deep, per Cubic Yard