Specifications include, but are not limited to: US30BY at Bridge Ave East Ramp Project on the Northeast Portland Highway (Rt. No. US30BY) in Portland. FAP No. S123(023). ($ 1,000,000 - $ 2,000,000). Req. approx. 350 hrs training; 1,400 ft2 temp. signs; 2 ea seq. arr. signs; 8 ea PCMS; 800 hrs flag.; 100 hrs flag. sta. light.; 1 ea TMA; 50 ft PCD; 0.5 acre temp. mulch.; 300 ft sed. barr.; 1,500 ton contam. soil disp.; segr. & stkpl. contam. soil; const. surv. wrk.; tree trim.; 0.75 acre udrbrsh. clear.; 960 hr scaler; 160 hr scaler sup.; 500 yd3 spoil rem.; 17,500 ft2 wire mesh sl. prot.; 20 ea supp. anc. nail; 85 ea tree rem.; traf. sig. mod.; 0.5 acre wd. ctrl. Completion Time: July 2, 2024. Class of Work: Earthwork and Drainage.