Specifications include, but are not limited to: Washington County Safety, Bike and Pedestrian Improvements Project on Various Highways near Beaverton. FAP No. SA00(375). ($ 1,000,000 - $ 2,000,000). Req. approx. 420 ft2 temp sign; 4 ea PCMS; 800 hr flag; 800 hr flag sta light; 2,890 ft stripe rem; 100 ft PCD; 205 yd2 comp erosion blanket; 340 ft sed barr; 43 ton contam soil disp; const surv work; 35 yd3 gen exc; 23 yd2 subg geotext; 5 ft pipe; 34 ton aggr base; 11 ton ACP; 103 ft conc curb; 428 ft2 conc walk; 2 ea curb ramp; 30 ft2 trunc dome; 5,600 ft pvmt mark durable; 18 ea pvmt legend; 650 ft2 pvmt bar; 309 ft2 green bike lane; 3,418 fbm wood sign post; 1,755 lb sign supp; 1,485 ft2 sign; traff signal mod; flashing beacon install, 3 yd3 topsoil. This project requires Railroad Insurance. Completion Time: May 12, 2025. Class of Work: Electrical.