Specifications include, but are not limited to: Rock Creek Bridge Project on the Wasco-Heppner Highway (Rt. No. OR206) near Condon. FAP No. S300(003). ($ 2,000,000 - $ 5,000,000). Req. approx. 600 hrs training; 870 ft2 temp. signs; 8 ea PCMS; 400 hrs flag.; 2 ea flag. sta. light.; 3,131 ft stripe rem.; 700 ft temp. gd. rl.; 1 ea port. traf. sig.; constr. & rem. temp. rdbd. & surf.; temp. wtr. mgmt. fac.; 855 yd2 matting; 1,940 yd2 comp. eros. blnkt.; 550 ft sed. fence; 334 ea sed. barr.; 22.5 ton contam. soil disp.; const. surv. wrk.; 5,246 yd3 exc.; 524 yd3 st. emb.; 560 ft per. ctrl. blst. holes; 4,465 yd2 geot.; 802 yd3 riprap; 55 ft vid. insp.; 121 ft pipe; 2 ea sl. end sect.; 70 ft2 pav. culv. end sl.; 393 ft drain. curb; wrk. contain. plan; br. rem. wrk.; 400 yd3 str. exc.; 480 yd3 gran. str. bkfl.; 18 yd3 drill. shft. conc.; 4000 lb drill. shft. reinf.; 304 ft CSL test acc.; 18 ea CSL test; 76 ft drill. shft. exc.; 25,500 lb reinf.; 147 yd3 gen. str. conc.; 14 yd3 UHPC; 750 ft prestr. gird.; 12 ea bear. dev.; 255 ft curb mt. rail; 3,972 ft2 poly. memb.; 284 yd2 CPPR; 2,307 ton aggr. base; 1,058 ton ACP; 712.5 ft gd. rl.; 62.5 ft conc. barr.; 10,794 ft hi-build paint; 0.4 yd3 conc. in sign sup.; 304 lb st. in sign sup.; 26 ft2 signs; 2 ea wtr. qual. sw.; 0.7 acre wd. ctrl.; 1 ea seed. mob.; 0.7 acre seeding; 40 ea trees; 92 ea tub. plant; 120 ea plant cut.; 638 ft fence; streambed enhance. Completion Time: November 15, 2024. Classes of Work: A) Earthwork and Drainage, or B) Bridges and Structures.