Specifications include, but are not limited to: The City of Claremont, NH is seeking proposals for the City Hall Elevator Modernization Project. City Hall Elevator: • Controller a. New TAC 32 Microprocessor Controller: • Non-Proprietary by Design – Includes on-board Diagnostics • Emergency Battery Lowering Device • Solid State Starters • Viscosity Control b. New Machine Room Wiring c. eMax Monitoring Device Provisions • Power Unit a. New Submersible Power Unit: • Motor, Pump, Valve, Muffler, and Tank b. New Isolation Couplings c. New Shutoff Valve (Machine Room) d. New Oil e. Oil Line Piping will be Reused and Modified as needed • Jack a. Jack Retained – Provide New Hydraulic Packing • Car a. New Toe Guard b. New Car Top Railing c. New Cab Fan: Two Speed d. New Car Top Exit Switch e. New Car Top Inspection Station f. New Car Roller Guides with Mounting g. Retain & Reuse Car Sling & Platform