Specifications include, but are not limited to: 3.1.1 Furnish and install a new 200amp 208v 3-phase company switch with set of 5 color coded Cam-lock devices with ground and neutral reversed from the other connections required and 200amp fused main. 3.1.2 Furnish and install a 200amp 3-phase feeder from the existing exterior company switch to the new company switch inside the building located at column line 16 in area B. (Feeder size to be 2: conduit with 4-3/0 cu conductors and 1 #6 ground) 3.1.3 Core drilling exterior wall (if required) 3.1.4 Furnish and install all miscellaneous materials as required for complete installation. 3.1.5 Furnish all tools, testers, and equipment needed to complete the work. 3.1.6 Replacement door of Panel BTP6 must be part of bid. 3.1.7 Complete all necessary permits required for the project. 3.1.8 The contractor can utilize the owner's lifts for feeder installation.