Specifications include, but are not limited to: 1. Below are the Conservation Conditions that will be required for this project. All conditions and regulations of any permit obtained for this project will be followed by the contractor. 2. The Contractor shall not stage, store, waste or stockpile materials and equipment in undisturbed locations, or in known/potential wetlands and/or known/potential streams that exhibit a clear “bed and bank” channel. Potential wetland areas consist of any area that is known to pond water, swampy areas or areas supporting known wetland vegetation or areas where there is a distinct difference in vegetation (at lower elevations) from the surrounding upland areas. Attachment 1 includes the NDOT Wetland Fact Sheet and map(s) of potential wetlands and/or other potential regulated waters features. These features were identified from a desktop review of published resources. The above condition pertains to the areas as listed on Attachment 1. If access to any of these areas is required to complete the project construction, the NDOT construction project manager shall coordinate with the Technical Resources Unit to determine need for field verification and/or permitting requirements prior to disturbance of the area. CONSERVATION CONDITIONS 1. Conservation conditions are to be fully implemented within the project limits as shown on the plans. EARLY CONSTRUCTION STARTS 1. Contractor requests for early construction starts must be coordinated by the Project Construction Engineer with the NDOT Environmental Section for approval to ensure avoidance of listed species sensitive lifecycle timeframes. Early start requests may require consultation with the USFWS and NGPC. Agency coordination time will vary depending on species and project location. T & E SPECIES 1. If federal or state listed species are observed during construction, the Highway Project Manager will contact NDOT Environmental Section to determine if additional species conservation conditions would be required prior to continuing project construction activities. Contact NDOT Environmental for a reference of federal and state listed species. Coordination with the USFWS and NGPC may be required depending on the species identified and construction activities. REFUELING 1. Refueling shall be conducted outside of those sensitive areas identified on the plans, in the contract, and/or marked in the field.