Specifications include, but are not limited to: The Work shall include: DIVISION 1: WATER MAIN REPLACEMENT – The work shall include approximately 2,015 linear feet of water main replacements ranging in size from 4-inch to 12-inch, 50 water service line replacements, valves, hydrants, and all associated excavation, bedding, backfill, testing, erosion control, maintenance of traffic, site restoration, and other incidental work required for a complete installation. DIVISION 2: SEWER SEPARATION – The work shall include approximately 4,665 linear feet of storm pipe ranging in size from 12 inch to 60-inch, 46 storm structures including manholes and inlets, and all associated excavation, bedding, backfill, testing, pavement repair, erosion control, sanitary system repair and relocation, maintenance of traffic, site restoration, and other incidental work required for a complete installation.