Specifications include, but are not limited to: A. Suspension and installation of hanging speakers using certified fly ware from building structure from ceiling on stage left / right / center. B. Establish all wire/pipe routes, chases, openings etc. for all needed cabling C. Supply and installation of all microphone/speaker/ line level audio cables, D. Construct and pre-wire equipment racks. E. Install input/output custom jack plates on stage proscenium walls F. Provide all needed conduit for any exposed low voltage cabling as required by code. G. Fully program and adjust digital signal processors and wall mounted presentation controller for multi-use pre-sets. Wall mounted touch screen will have to following functions: 1) activate hot mics with independent volume control of each 2) turn on/off video projector and raise/lower projection screen 3) activate blue tooth with volume control 4) volume control of video source H. Remove and discard all old audio equipment. I. Provide a fully functioning and operational sound system as described in the equipment listed below. J. Provide a final “Working design file” for the DSP processors. K. Obtain all needed permits. L. Install dedicated Wi-Fi network for iPad control of mixer N. Configure the system so the on-stage hot mics and blue tooth audio are controlled via the wall mounted controller for a stand-alone presentation system. O. Provide full system programing and setup plus allow for 4 hours of end user training on the sound system proper use and care. All products should come with a minimum ten-year manufacturer’s warranty and all workmanship should carry a one-year warranty.