Specifications include, but are not limited to:The project will repair spalled, delaminated, and cracked areas concrete and corroded exposed reinforcing in the deck, girders, floor beams, abutments, pier walls, and parapets that contribute to the bridge’s poor state. Work will consist of chipping or sawing out the old concrete, installing reinforcement, patching with epoxy grout, mortar and/or concrete, and applying sealant. The existing asphalt concrete and base course on the deck will be removed, and a new concrete deck will be placed on top of the original deck along with an asphalt overlay. In addition, an elevated walkway on the downstream side of the bridge, which was initially added in 1927, will be restored to operational condition by placing new, pre-formed concrete slabs for the walkway surface and sides.