Specifications include, but are not limited to: Below is a summary of work. Please review the Architectural drawings and Specifications for detailed scope. A. Select demolition of floor, intersecting walls, ceilings, and MEP systems to prepare for new construction B. Contractor to provide a new 60 sqft single user restroom, a 90 sqft Lactation Room, and (2) 90 sqft offices. C. Provide new power and lighting as required and modify the HVAC to provide supply and return for the new Documentation Room D. Install sound absorption blankets in the ceiling to prevent sound transfer E. Selective demolition of the floor for utilities.Demolition to occur in the morning (to minimize disruptions to neighboring tenants). F. Low Voltage / Networking cables and hardware. G. Painting, and Flooring