Specifications include, but are not limited to: 1. REMOVE NEUTRAL-GROUND BOND IN EQUIPMENT PREVIOUSLY SERVING AS SERVICE ENTRANCE EQUIPMENT. MAINTAIN INDIVIDUAL BUILDING GROUNDING SYSTEMS. 2. PROVIDE 200A FUSED DISCONNECT, FUSED AT 200A, IN NEMA 3R ENCLOSURE. INTERCEPT EXISTING FEEDER TO PANEL WITH FEEDER FROM NEW MDP. 3. GROUNDING: PROVIDE SYSTEM GROUNDING PER NEC. 4. PROVIDE NEW FEEDERS TO PANELBOARDS OR EQUIPMENT. FEEDER SIZES INDICATED ARE BASED ON DESIGN VOLTAGE DROP CALCULATIONS. VERIFY SIZING OF FEEDERS WITH ACTUAL LENGTHS OF CONDUCTORS AND FIELD CONDITIONS PRESENT DURING CONSTRUCTION. 5. ROUTE NEW FEEDER INTO EXISTING SERVICE DISCONNECT AND EXTEND TO EXISTING PANELBOARD MDP-W. EXISTING FEEDER FROM EXISTING DISCONNECT TO MDP-W MAY BE REUSED IF IN GOOD CONDITION AND MEETS CODE. 6. ALTERNATE 1 - GENERATOR: PROVIDE GENERATOR FEEDER CABLE AS ALTERNATE 1 PACKAGE. FEEDER CONDUIT CONNECTING ATS TO GENERATOR IS PART OF BASE BID. SEE GENERATOR SCHEDULE ON SHEET E601 FOR ADDITIONAL INFORMATION. 7. EXISTING SERVICE ENTRANCE BOND: MODIFY BOND WITH CHANGE OF SERVICE ENTRANCE LOCATION. 8. SEE ATS SCHEDULE ON SHEET E601 FOR ADDITIONAL INFORMATION. 9. REUSE EXISTING CONDUITS AS APPLICABLE. PROVIDE NEW CONDUCTORS FROM SOURCE TO DISCONNECT IN PANEL.