Specifications include, but are not limited to: EXTERIOR A. The Contractor shall remove existing shingles and shall repair any damaged or deteriorated roof decking with same type decking. Contractor shall install new brown drip edge around perimeter of each cabin. B. The Contractor shall install new synthetic felt and shall install ice and water shield around perimeter of roof as well as valleys and ridge line. C. The Contractor shall construct a cricket on the chimney on cabin 10 and shall install step flashing as needed. D. The Contractor shall identify the cabins where the vent pipes are broken below the decking and shall install new vent pipes using PVC pipe and use rubber adapters as needed. Contractor shall install new pipe boots. E. The Contractor shall install GAF Timberline HDZ lifetime warranty shingles; color shall be Bark wood. Shingles shall be installed with 1 1/4 roofing tacks. F. The Contractor shall remove all existing guttering, siding, trim and facia, and prep buildings for new materials to be installed. Scope: INTERIOR A. The Contractor shall install one extra 110 volt plug in every bedroom in each of the five cabins. B. The Contractor shall remove light fixture in the ceiling of the bathroom in cabins 6, 7, 8 and 10, and shall install Broan model # A110+L light fan combo or equal and vent to outside air. C. The Contractor shall remove single switch box and install a 2-gang box and have one switch for Broan model # A110L vent fan light combo or equal, and for the new Halo-6-inch shower light, or equal (all on same switch), and one switch for vanity lights in cabins 6, 7, 8 and 10. D. The Contractor shall remove existing 36-inch fiberglass shower stall and shall install new tile; shower wall and shower ceiling tile shall be DELLA TORRE Riverdale Sand 12-inch x 24-inch or equal, and shower floor and accent tile shall be DELLA TORRE Riverdale Sand or equal, and trim tile 3-inch x 12-inch bullnose DELLA TORRE Riverdale Sand or equal, with epoxy grout. The contractor shall install new floor drain assembly with proper fall in shower floor to drain properly. Contractor shall install Halo 6 - inch or equal shower light. Contractor shall install new brushed nickel Delta lever handle faucet and shower head assembly in cabins 6, 7, 8, and 10.