Specifications include, but are not limited to: 1 1 LS Remove landscaping shrubs, boulder, sod, and/or rock. Remove/re-adjust irrigation sprinklers (as necessary) and relocate irrigation sleeve beneath new pedestrian infrastructure area. Construct Pedestrian Ramp – East Side, Pedestrian Ramp – West Side, and Pedestrian Median Refuge, complete and in place. $ _______ /LS $ ___________ 2 2 EA Install Rectangular Rapid Flashing Beacon (RRFB)Set, complete and in place. $ _______ /EA $ ___________ 3 160 LF Install Thermoplastic Crosswalk, complete and in place. $ _______ /LF $ ___________ 4 2 EA Install complete set Yield Triangles Thermoplastic, complete and in place. $ _______ /EA $ ___________ 5 2 EA Install “Yield Here to Pedestrian” (R5-1), including sign and post, complete and in place. $ _______ /EA $ ___________