Specifications include, but are not limited to: the upgrade of audio amplifiers and Fire Alarm Control Panels (FACP) at the following locations: LAS Terminal 1, LAS Terminal 3, LAS D-Gates, LAS Aircraft Rescue and Fire-Fighting (ARFF) Station, Henderson Executive Airport, Airport Rent-A-Car Center (ARAC) and the Airport Bus Maintenance Facility (BMF). Additionally, the scope of work includes the design and installation of a new fire alarm system for the existing LAS Central Plant 1 Building. The Central Plant 1 Building does not currently have a fire alarm system. The Contractor will be responsible for the demolition and relocation of existing FACPs and audio amplifiers, all conduit, wiring, power, data cabling, and other infrastructure removal or installation as needed.