Specifications include, but are not limited to: PART A: SANITARY SEWER 1 561 LF 8” Sanitary Sewer Pipe 2 2 EA Standard Manhole (4’ Diameter) 3 1 EA Connect to MH – Outside Drop 4 3 EA 8” x4” Tee w/Riser Assembly 5 1 LS Seeding & Erosion Control 6 1 LS Site Clearing & Restoration PART B: WATER DISTRIBUTION 7 485 LF 8” Water Line Pipe 8 60 LF 2” Water Line Pipe 9 2 EA 16”x8” Tapping Assembly 10 3 EA 8” x 2” MJ Tee & Valve 11 1 EA Fire Hydrant Assembly 12 1 LS Seeding & Erosion Control 13 1 LS Site Clearing & Restoration PART C: PAVING – EAST ½ OF SUNSET DR. 14 100 LF Remove & Replace Curb & Gutter 15 1,200 LF Curb & Gutter 16 2,590 SY 8” Reinforced Crushed Rock Base 17 2,070 SY 6" Asphaltic Concrete Pavement 18 2,600 SF 5’ Concrete Sidewalk (4“) 19 1 EA Wheelchair Ramp W/ Detectable Surface 20 145 LF 18” SWS Pipe 21 37 LF 30” SWS Pipe 22 56 LF 36” SWS Pipe 23 1 EA Curb Inlet (Type 1A) (L=10’ W=4’) 24 1 EA Curb Inlet (Type 1A) (L=10’ W=5’) 25 1 EA Curb Inlet (Type 1A) (L=10’ W=6’) 26 3 EA Inlet Hookup 27 1 LS Signage 28 1 LS Traffic Control 29 1 LS Site Clearing & Restoration PART D: PAVING – WEST ½ OF SUNSET DR. 30 2,786 SY Pavement/Subgrade Removal (14") 31 2,786 SY 8” Reinforced Crushed Rock Base 32 2,634 SY 6" Asphaltic Concrete Pavement 33 53 LF Remove & Replace Curb & Gutter