Specifications include, but are not limited to: A. Concrete Pavement Repairs and Debris Removal/Disposal 1. The contractor shall provide equipment, labor, material, and traffic control. The equipment and labor will be used to perform the work of saw cutting existing concrete pavement, removal of the existing pavement, placement of the concrete pavement repair and disposal of the removed existing concrete pavement and related debris. The contractor shall also perform the saw cutting and resealing after the concrete pavement repairs are placed. KCRC shall provide permanent pavement markings as required. 2. Single pay item will be per cubic yard for placed concrete pavement. B. Setup 1. Work shall be performed as described in the Maintenance of Traffic Special Provision that is attached in this document. Give ‘Em A Brake Safety will be performing the traffic control for this contract under their contract with KCRC. 2. Work shall be performed starting upon approval and end on December 31, 2023. 3. The contractor shall notify the Road Commission 10 days before the start of work. Once the work starts the contractor shall stay on site until the work is completed per the Road Commission. 4. Perform concrete pavement repairs in accordance with the MDOT 2020 Standard Specifications for Construction, MDOT standard plans (R-44-F is included in this document), and as directed by the MDOT Engineer. 5. The location of the concrete pavement repairs shall be determined by the Maintenance Coordinator. The location, size and quantity of patches may be field adjusted by the Maintenance Coordinator, depending on conditions. For informational purposes assume 39 concrete pavement repair locations (12' x 14' on average).