Specifications include, but are not limited to: 1. Bid Item – Mobilization, Demobilization and Bonding – Lump Sum The lump sum bid price for mobilization and demobilization includes preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to and from the Project Site; for the establishment of offices, buildings, and other facilities necessary for the Work; costs for permit fees, bonds, and insurance for the Work; site cleanup during the Project and at the completion of the Project; and for other operations performed or costs incurred before the beginning of the Work. 2. Bid Item – Roof Insulation – Lump Sum The lump sum bid price for roof insulation shall include all labor, materials and equipment necessary for installation of insulation in the existing metal building. The retrofit application of the insulation shall be completed from the interior of the building only. No roof metal shall be removed for the installation. The price shall include removal and reinstallation of all fixtures and items removed during the application of the suspension fabric liner and insulation.