Specifications include, but are not limited to: The proposed Preston Bunch Lane Subsidence AML Reclamation Project will repair a portion of a public roadway approximately 1700 feet long that has been damaged by mining subsidence and/or mining influenced slope instability. The work will consist of excavating the subgrade to specified depths then backfilling and compacting with soil and with roadway stone to stabilize the roadbed. The driving surface will be reestablished with Bituminous Pavement. Drainage culverts will be replaced with 24-inch diameter HDPE culverts. The site is located in the Madisonville West Quadrangle at N 37 16' 34", W 87 30' 22". The problem areas are approximately 550' to 2,250' from the intersection of US 41 and Preston Bunch Lane on the north side of Earlington, KY.