Specifications include, but are not limited to: Demolition and replacement of the existing HVAC controls system at the Alcohol Beverages Division (ABD) facility. IT IS THE INTENT OF THIS PROJECT TO COMPLETELY REPLACE THE ENTIRETY OF THE EXISTING CONTROLS SYSTEMS. THE SCOPE OF WORK SHALL INCLUDE THE REMOVAL OF THE EXISTING BUILDING CONTROLS SYSTEM, PANELS, WIRING, CONDUIT, CONTROLLERS, SENSORS, ACTUATORS, ETC. THE NEW SYSTEM SHALL INCLUDE, BUT NOT BE LIMITED TO, THE FOLLOWING: CONTROL PANELS, CONTROLLERS, WIRING, CONDUITS, SENSORS, SOFTWARE, ACTUATORS, ETC. THE EXISTING SYSTEM IS SIEMENS DESIGO. SCHEDULING AND PHASING OF PROJECT MUST BE COORDINATED WITH OWNER. NOTE THAT THE OWNER IS REPLACING THE BOILERS AS PART OF A SEPARATE PROJECT. COORDINATE REQUIREMENTS WITH OWNER. PLENUM RATED CABLING WILL BE REQUIRED IN THE OFFICE AREA. PROVIDE PROTECTIVE PLASTIC SHEETING OVER OFFICE DESKS, EQUIPMENT, ETC. TO PREVENT DUST AND DEBRIS WHILE WORKING IN OFFICE AREA. OWNER SHALL HAVE FIRST SALVAGE RIGHTS TO ALL CONTROLS COMPONENTS. SPECIFIC EQUIPMENT MENTIONED FOR SALVAGE ARE TECs, VALVES, DAMPER ACTUATORS, AND T-STATS.