Specifications include, but are not limited to: Furthermore, includes but not limited to the following: 1. Provide custom air-handling systems as defined by Spec Section 237313.16 2. Provide low humidity units. 3. Reference drawings M303A, M304A & M501A. 4. Coordinate with all mechanical, plumbing and electrical design documents to create a fully coordinated submittal for each component. 5. Provide delivery to the jobsite to be turned over to a mechanical contractor that will be contracted in a later bid package. 6. The vendor is to include any storage required prior to the delivery date based on the project schedule. 7. The vendor shall include the warranty as specified. The warranty shall not start on the date of delivery. The warranty shall start on the date of Substantial Completion as defined by the Project Schedule included. 8. Furnish extra materials that are specified. These extra materials are to be packaged with protective covering for storage, and are identified with labels describing contents. 9. Furnish of all submittals per specification. 10. Walls of the air handling unit shall be wipe down construction.