Specifications include, but are not limited to: The CM/GC Work for the project consists of two (2) phases: Pre-construction and Construction. A. Preconstruction Phase: This phase of the Work includes, but is not limited to, attending design meetings, estimating and cost control, schedule development, and drawing/constructability reviews. The Construction Manager shall provide a full construction estimate at the design development design phase prior to issuance of final construction documents to assist the Owner and Design Consultant in maintaining the cost of construction within the FLCC and the duration of the construction within the project’s schedule. The Construction Manager shall monitor the bid climate and make recommendations to the design team as to the most advantageous bidding time/schedule and then solicit bids from sub-contractors. The Construction Manager is required to provide a Guaranteed Maximum Construction Price (GMP) at completion of any revisions of the construction documents by the Architect. B. Construction Phase: This phase of the Work consists of the Contractor furnishing and installing all work as required in the Contract Documents. Scope of Work See the Project Manual and drawings. Drawings are approximately 50% compl