Specifications include, but are not limited to: The Winfred Smith Site will consist of a 45' Long 4' high Concrete Gravity Wall, which will divert water from large drain behind house, 275' of ECB "V" Ditch will be constructed to create positive drainage around residence. The placement of a 24" HDPE pipe in place of damaged existing CMP pipe will be done. The Haven King Site with consist of the regrading and revegetation of 2 small slide areas just South of residence, regrade and replacement of 240 LF of Class II ditch. The placement of a 24" HDPE pipe with 1-ELL headwall on inlet end of pipe to replace damaged existing CMP pipe will be done. The Michael Smith Site will consist of the replacement of 2-CMP pipes with a 24" HDPE pipe with Sloped and Flared headwalls on each end of pipe to replace damaged existing CMP pipe. The construction of a 24" Sloped and flared headwall on an existing 24" HDPE pipe to promote positive drainage. The placement of an additional 24" HDPE pipe with Sloped and Flared headwalls on each end of pipe in place of damaged existing CMP pipe will be done. The Red Hill Baptist Church site will consist of the regrading and revegetation of 1 0.5 acre slide areas and 1 small slide just North of Church, regrade and replacement of 160 LF of Class II ditch. Mobilization is setup to provide for construction equipment to be delivered to the site. Earthwork work bid item is included to excavate material to seat wall and at other areas as directed by the ENGIEER. Material will remain on site. Silt fence or straw bales will be installed prior to construction on all sites. Site Prep is included at all the sites. Revegetation and Residential Seeding are included for all reveg efforts within the sites. Roadway Stone are included to provide for access during normal reclamation. Bituminous Repair is included to repair "in kind" all asphalt surfaces damage due to normal reclamation activities. Waste Area: All material will be wasted on site. Any permits will be obtained prior to construction. No trees 3" diameter or more at breast height will be disturbed, with the exception of those in the slide and transition areas. No cave-like structures will be closed, and no cliff-lines will be disturbed.