Specifications include, but are not limited to: providing all the labor, equipment, tools, hardware, and reporting necessary to conduct testing, inspections, maintenance, repairs, design, and modifications for the fire life safety systems (FLSS) of the City of Phoenix Convention Center West, North, Orpheum Theatre and Tonto Yard Buildings. This scope includes fire alarm control equipment, field devices, networking hardware, PC Graphical Interface Equipment, Life Safety Cabling/Fiber, Sequence Of Events, and the integrated voice evacuation system up to and including full system replacement The contract duration is five (5) year, period, beginning on or about January 4, 2024, according to the provisions, specifications and attachments contained herein. The awarded Contractor(s) shall also provide all the professional services, labor, and reporting required to test the sequence of operation of the building automation control functions initiated by the alarm system including Smoke Removal, Elevator recall functions, door holders, damper operation, HVAC shutdown, or other systems interfaced with the fire alarm system. Any service or repair required for the building automation controls or elevator system that is not alarm equipment shall be excluded from the contract.