Specifications include, but are not limited to: All work performed must meet ADEQ aquifer protecting rules, MAG Standards, and IPC. Contractor to provide operation and maintenance manuals on all installed equipment. All taxes and fees are to be included in the contract price. All work performed must meet ADEQ aquifer protecting rules, MAG Standards, and IPC. Contractor to provide operation and maintenance manuals on all installed equipment. All taxes and fees are to be included in the contract price. The following is a summary of all required maintenance. • QUARTERLY (3-months) o Tanks and reports ▪ Double check the facilities logs on the holding tanks and manhole inspections. ▪ Double check that facilities have been regularly cleaning out the effluent filters. o Lift stations 1, 2, and 3. ▪ Check Bio filters in lift stations, pull and clean. ▪ Check floats, verify pumps shut off when low level alarm activates. ▪ Verify high level alarm functioning properly. o Effluent Ponds ▪ Check flow is reaching ponds. ▪ Log levels of water in primary pond (primary meaning pond in use). ▪ Switch flow to the other pond if necessary ▪ Check and Log overall condition of pond liner and if any debris. Provide a detailed Quarterly report. Provide a Standard and Emergency Call out rate. (With Cost inflation adjustment over the multi-year contract) Provide suggested P.O. estimate for standard Equipment failure (Over the multi-year contract) Costing for the first 5-years execution of the plan.