Specifications include, but are not limited to: The intersection at 9th & Main does not allow for safe maneuvering of traffic and pedestrians due to the existing curb return configuration. The project will include the reconstruction of the existing roadway, landscaping strips on both sides of the road, ADA compliant curb returns, sidewalks, reconfiguration of the affected storm drainage system, signing, striping, and any additional minor improvements. All improvements will be constructed to the current City standards. The following is a brief summary of the major elements of Work that are to be provided by the Contractor: - Traffic Control - Potholing - Demolition - Roadway and Trench Excavation - Stormwater Infrastructure Construction - Roadway Reconstruction/Construction - Walkway and Curb Return Reconstruction/Construction - Asphalt Paving - Pavement Striping - Signing - Landscaping