Specifications include, but are not limited to: 1. Temporary erosion and sediment control measures will be implemented including; temporary sump, pump, and dewatering bag(s), rock check dams, super silt fence, and stabilized construction entrances as shown on the Plans. The construction sequence has been planned to utilize proposed permanent channels to prevent run-on into disturbed areas during construction and promote maintenance of vegetative buffers. 2. Clearing and grubbing. 3. Stripping and removal/stockpile of surface soil suitable for use as soil cover. 4. Demolition (48-Inch RCP Pipe Removal) and existing building foundation/slab. 5. Riprap channel and rock toe construction. 6. Channel repair, replacement, and re-alignment. 7. Erosion repair and grading of refuse. 8. Borrow and Waste Site Development. 9. Installation of soil cover. 10. Installation of an underdrain to improve drainage at an existing underdrain outlet. 11. Revegetation.