Specifications include, but are not limited to: 0005 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0010 207001-001 UNCLASSIFIED EXCAVATION CY 15,665.000 _________._____ _________._____ 0015 211008-000 ROCK BORROW EXCAVATION TN 3,438.000 _________._____ _________._____ 0020 306001-001 RUBBLIZATION SY 187,984.000 _________._____ _________._____ 0025 306002-001 FILL AGGREGATE TN 2,500.000 _________._____ _________._____ 0030 408001-003 NON-TRACKING ASPHALT MATERIAL GA 11,287.000 _________._____ _________._____ 0035 410001-030 SUPERPAVE ASPHALT BASE CRSE, TY 19 SY 259,181.000 _________._____ _________._____ 0040 410007-060 SUPERPAVE ASPHALT SKID PVT, TY 12.5 SY 259,181.000 _________._____ _________._____ 0045 415005-001 STANDARD MILLING MAINLINE SY 187,984.000 _________._____ _________._____ 0050 415005-001 STANDARD MILLING RAMPS AND SHOULDERS SY 71,197.000 _________._____ _________._____ 0055 606020-001 AGGREGATE FILLED FABRIC UNDERDRAIN, LF 57,205.000 _________._____ _________._____ 0060 606025-002 4 INCH UNDERDRAIN PIPE LF 1,310.000