Specifications include, but are not limited to: 1. Demolition and removal of existing 4 UV banks, 2 bank supports, UV control panels, ballasts, and equipment pads, low level probes and level sensors, 2 channel baffle walls, air compressor piping, 4 sets of overhead ventilation leading to ballasts, and 3 vertical turbine pumps in the UV Disinfection Building (Building B12). Replacement of two transformers located west of the chemical feed building. 2. Installation of 4 UV disinfection banks and associated instrumentation, 2 flow conditioners, hydraulics systems center, system control center, 3 vertical turbine pumps, electrical switchgear and appurtenances, and flow relief pipe. 3. Other Work indicated in the Contract Documents