Specifications include, but are not limited to: 1.1 Soil Treatment a) Remove MULCH/soil at sections R01, R03, W01, W04 & DZ Replace soil to meet proper grade. Provide and install landscape fabric and mulch . (See site sketch) Notes for section 1.1 1. Contractor shall Insitu Sample all Right of Way areas that weren’t sampled in the initial sampling effort and record the readings on the As-built. If any areas are above the current action level, they shall be included in the remediation associated with this scope. A change order will be produced to cover the additional remediation costs if necessary. 2. SEE NOTES ON THE LAST PAGE OF THE ACCESS AGREEMENT FOR ADDITIONAL INFORMATION (IF APPLICABLE) 3. Soil excavation shall be at a minimum of 4”, further (up to 12”) if quadrant sampling remains above 400ppm. 2.0 Materials Specifications *NOTE: The Contractor shall provide quality control sampling documentation of the backfill, sod & mulch for each group of properties prior to installation. 2.1 Soil Soil mix/Top soil – Terry Hughes, Top soil blend – Soil Dynamics or “Approved” equal. Contains less than 100 mg/kg average Lead (Pb), less than 22 mg/kg average Arsenic (As), less than 25 mg/kg average Cadmium (Cd), less than 1800 mg/kg of Manganese (Mn) & no contaminants at concentrations that pose a risk to human health and the environment. Sufficient quality to grow grass and sustain vegetable gardens (as verified by appropriate nutrient testing. including at a minimum 5% organic matter) & contains insignificant amounts of debris (tree roots, rocks, etc.). 2.2 Mulch Natural color