Specifications include, but are not limited to: This Project will consist of the construction of a new, ADA compliant shared use path (SUP) and Ramada Pads at Garden Canyon Linear Park starting at the existing parking lot just east of Saint Andrews Drive and just south of Garden Canyon Wash. This path will proceed northeastward into Garden Canyon Linear Park to create a closed travel circuit. The new SUP will be constructed of two inches (2”) of asphalt concrete over four inches (4”) of aggregate base course. The SUP will be 10’ wide along the main pathway and 8’ wide between the main path and each ramada pad. The project will include but not be limited to the installation of rip rap rock at wet crossings, asphalt pads for future ramadas, purchase and installation of 4” schedule 40 Conduit under the path in various locations, and purchase/installation of signage.