Specifications include, but are not limited to: 0005 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0010 207001-001 UNCLASSIFIED EXCAVATION CY 1,422.000 _________._____ _________._____ 0015 211008-000 ROCK BORROW EXCAVATION TN 561.000 _________._____ _________._____ 0020 229001-000 SHOULDERS AND DITCHES MI 16.640 _________._____ _________._____ 0025 408001-003 NON-TRACKING ASPHALT MATERIAL GA 7,889.000 _________._____ _________._____ 0030 601046-001 MODIFIED CONCRETE END POST EA 4.000 _________._____ _________._____ 0035 607001-001 TYPE 1 GUARDRAIL, CLASS I LF 15,975.000 _________._____ _________._____ 0040 607001-001 TYPE 1 GUARDRAIL, CLASS V LF 487.500 _________._____ _________._____ 0045 607006-001 THRIE BEAM GUARDRAIL BRIDGE TRANSITION EA 4.000 _________._____ _________._____ 0050 607010-020 GUARDRAIL REMOVAL LF 17,875.000 _________._____ _________._____ 0055 607048-002 BRIDGE POST SIDE MOUNTED WITH HARDWARE EA 31.000 _________._____ _________._____ 0060 607065-001 FLARED END TERMINAL EA 1.000