Specifications include, but are not limited to: 0005 201001-000 CLEARING AND GRUBBING LUMP SUM LUMP SUM _________._____ 0010 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0015 207001-001 UNCLASSIFIED EXCAVATION CY 1,070.000 _________._____ _________._____ 0020 207002-000 SUBGRADE CY 288.000 _________._____ _________._____ 0025 207034-000 FABRIC FOR SEPARATION SY 1,779.000 _________._____ _________._____ 0030 211001-000 UNCLASSIFIED BORROW EXCAVATION CY 580.000 _________._____ _________._____ 0035 218007-000 FABRIC FOR EROSION CONTROL SY 21.000 _________._____ _________._____ 0040 307001-000 AGGREGATE BASE COURSE, CLASS 1 CY 286.000 _________._____ _________._____ 0045 307001-000 AGGREGATE BASE COURSE, CLASS 10 CY 75.000 _________._____ _________._____ 0050 408002-001 ASPHALT MATERIAL GA 17.000 _________._____ _________._____ 0055 415005-001 STANDARD MILLING SY 125.000 _________._____ _________._____ 0060 601002-001 CLASS B CONCRETE CY 3.300