Specifications include, but are not limited to: There was a water line failure that caused some damage to the existing pavement and which is need of repair . This project is to Rotomill 4 inches of asphalt pavement and pave back with 1/2 HMA. This covers the entire width of the freeway at this location for 400 ft. Milling could be deeper depending on the condition of the pavement once milled 4 inches . The following items will need to be done on this project. Rotomill 4 inches of the existing HMA 3689 SQ YD, Place HMA 1/2” (4 Inch) PG 64-34, All pavement markings will be repainted in the same locations with two coats of paint, Traffic control will be provided by the contractor. Location: I-15 SB MP 331.7 Hillfield Road An aerial view of a city Description automatically generated with low confidence Figure 1. Location of repair area I-15 SB MP 331.7 Hillfield Road General Notes: Items of work to be included in Rotomill and Paving repair are included in the summary below: SUMMARY ITEMS QTY UNIT NOTES ROTOMILLING 4 INCH 3689 SQ YD NO TRAFFIC ON ROTOMILLED SURFACE HMA 1/2" (4 INCH) 815 TONS MOBILIZATION 1 EACH TRAFFIC CONTROL 1 LS PAVEMENT MARKING PAINT 34 GALLON ALL STRIPING MUST BE DOUBLE COATED