Specifications include, but are not limited to: • The work shall consist of milling to a minimum depth of one and one half (1.5) inches, patching (12.5mm or 19mm) as required, and paving with 12.5mm at 165 lbs./SY or as directed by the engineer/COSS representative. • Temporary striping where required shall follow within twenty-four (24) hours of resurfacing. • Permanent traffic striping shall take place no later than fourteen (14) days after resurfacing. • Roads shall not remain milled for a period of more than seven (7) days. • All tack shall be trackless tack approved by the Georgia Department of Transportation. Refer to QPL #7 “Sources of Bituminous Materials”. • Working hours are expected to be Monday to Friday, 8 AM to 5 PM, with the exception of all Collector, Arterial, and Minor Arterial streets work hours being Monday to Friday, 9AM to 3PM. 1 150-1000 Traffic Control LS 1 $ $ 2 151-1000 Mobilization LS 1 $ $ 3 402-1802 Patching (Not to exceed, as directed by engineer) TN 5,000 $ $ 4 402-3130 Asphalt TN 31,550 $ $ 5 407-0010 Asphalt Rubber Joint and Crack Seal, TP M LF 20,000 $ $ 6 413-1000 “Trackless” Tack GL 32,000 $ $ 7 432-5010 Milling SY 385,000 $ $ 8 611-8050 Adjust Manhole (MH Riser) EA 60 $ $ 9 611-8140 Adjust Water Valve (Valve Riser) EA 60 $ $ 10 653-0110 PVMT Marking Arrow, TP1 (Straight) EA 15 $ $ 11 653-0120 PVMT Marking Arrow, TP2 (Left or Right) EA 40 $ $ 12 653-0130 PVMT Marking Arrow, TP3 (Straight/Turn) EA 20 $ $ 13 653-0210 PVMT Marking Word, TP1 (ONLY) EA 20 $ $ 14 653-1501 Solid Traf Stripe, 5 IN, White LF 90,000 $ $ 15 653-1502 Solid Traf Stripe, 5 IN, Yellow LF 90,000 $ $ 16 653-1704 Solid Traf Stripe, 24 IN, White LF 800 $ $ 17 653-1804 Solid Traf Stripe, 8 IN, White LF 6,000 $ $ 18 653-1806 Solid Traf Stripe, 8 IN, Yellow* LF 6,000 $ $ 19 653-3501 Skip Traf Stripe, 5 IN, White GLF 15,000 $ $ 20 647-6090 6’X40’ traffic Loop EA 15 $ $ 21 647-6090 6’X6’ Traffic Loop EA 15 $ $