Specifications include, but are not limited to: The Dreamscape Learning project will include a buildout of an approximate 4,000-6,000 SF space to support a virtual reality learning classroom located in Lied Library. There will be one 16-seat classroom (approximate) and one room that is free roam. The project will include a DIRTT construction system, raised floor systems, and audiovisual systems that integrate into the Dreamscape pods. The CMAR will provide cost estimate services as well as provide a schedule and constructability assessment. The estimated funding amount is subject to change based on the determined scope, schedule and actual funding received for the project. Pre-Construction work will be performed on a fixed price basis (see Pricing Response Form Attachment). The cost of the construction work will be based on a Guaranteed Maximum Price (GMP) as described in the Contract Documents. UNLV will request GMP’s per the Pre-Construction Contract for the base bid and any alternate work. The Design Team and the UNLV Team will develop the building program by reviewing and incorporating the stakeholder’s vision and needs along with UNLV facility standards. The CMAR will review the final program, and work with the Design and UNLV team to develop proposed design drawings, construction means & methods, provide constructability review, project schedule, and cost estimates. The CMAR should advise whether the cost is within the budget and provide input should the cost exceed the anticipated budget. The CMAR will also provide options for cost savings and efficiencies that are consistent with the facility program, function, quality and vision.