Specifications include, but are not limited to: The project includes all components of site, structural, MEP and architectural as required for the construction of a new 6,420 gsf Pre-Engineered Metal building with a concrete slab (half on grade, half elevated over a cast-in place mechanical area/walkout basement). The facility will have a half-court basketball court with liner panel, sports pads and a ceiling hung basketball backstop and goal. An additive alternate is included for a sports floor system. Also included are metal stud and gypsum offices and special activity areas with HM steel doors, frames and windows. Aluminum exterior windows and storefront entry vestibule is also included. All surfaces to be paint finish including suspended gypsum ceiling system