Specifications include, but are not limited to: The work to be performed under this Contract is for a new Peace Way Bridge at Clark County 215 Beltway and roadway improvements along Peace Way from Hualapai Way to Cimarron Road. Construction shall include a two-span precast concrete girder bridge carrying Peace Way over CC215. Roadway improvements to include rehabilitate or reconstruct Peace Way roadway, cold planing, plantmix bituminous surface and base, UTACS, new curb and gutter, curb and gutter reconstruction, sidewalk, sidewalk reconstruction, sidewalk ramps, sidewalk ramp reconstruction, median construction, concrete barrier rail, utility adjustments, LED street lights for bridge and parcels receiving curb and gutters, underdeck lights on bridge, chain link fence, Intelligent Traffic System (ITS) conduit, upgrade/replace all signage; school flashing beacon modification, traffic control devices, traffic signal modifications, impact attenuator, and pavement markings along with associated traffic control and dust control. This work also includes thin bonded multilayer overlay of existing bridge deck of the Fort Apache bridge over CC215.