Specifications include, but are not limited to: The City of Pendleton, herein referred to as City, currently has four pumps at their River Intake Station. All of the pumps have been in operation since 2003 with various hours on them. The City is requesting proposals to pull one of the 250 hp pumps at the River Intake Building located at 73400 Mytinger Lane that has previously been refurbished and to install a new pump. All of the pumps at the River Intake Station pump gritty, muddy water during the winter months. Motor will be unwired and pump base will be unbolted from system prior to Contractor arriving. Contractor will be responsible for removal of the existing motor, pump base and pump and installation of the new pump along with all new spider bushings and shafts, reconnecting to existing piping set and recoupling the motor to the pump. The City will wire the motor. The shaft that goes through the stuffing box needs to have a ceramic coating 2” above the box through the box to 2” below to help with shaft wear due to gritty water. Contractor will be onsite for startup and provide a one (1) year warranty on workmanship and repairs from the date of each startup.