Specifications include, but are not limited to: GROUP 1 GRADING 0001 0030.10 MOBILIZATION 1.000 LUMP 0002 1009.00 GENERAL CLEARING AND GRUBBING 1.000 LUMP 0003 1011.00 WATER 32.000 MGAL 0004 1030.00 EARTHWORK MEASURED IN EMBANKMENT 4634.000 CY 0005 1701.24 24" DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 154.000 LF 0006 2009.51 CRUSHED ROCK EMBEDMENT 8.650 STA 0007 2010.00 CRUSHED ROCK SURFACE COURSE 306.000 CY GROUP 4 CULVERTS 0008 0030.40 MOBILIZATION 1.000 LUMP 0009 4040.00 REMOVE HEADWALLS FROM CULVERTS 3.000 EACH 0010 4050.01 EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS 30.000 CY 0011 4107.07 CLASS 47B-3000 CONCRETE FOR CONCRETE COLLARS 3.480 CY 0012 4157.00 REINFORCING STEEL FOR COLLARS 204.000 LB 0013 4390.48 48" ROUND EQUIVALENT METAL PIPE FLARED-END SECTION 3.000 EACH 0014 P375.48 48" ROUND EQUIVALENT CULVERT PIPE, TYPE 3,4,OR 5 28.000 LF GROUP 5 SEEDING 0015 0030.50 MOBILIZATION 1.000 LUMP 0016 1111.05 REMOVE SILT FENCE 1550.000 LF 0017 L001.01 SEEDING, TYPE A 1.000 ACRE 0018 L006.00 COVER CROP SEEDING 1.000 ACRE 0019 L019.13 EROSION CONTROL, CLASS 1D 4035.000 SY 0020 L019.20 EROSION CONTROL, CLASS 2A 318.000 SY 0021 L022.11 FABRIC SILT FENCE-LOW POROSITY 1722.000 LF 0022 L022.12 FABRIC SILT FENCE-HIGH POROSITY 221.000 LF 0023 L022.73 SILT FENCE CLEANOUT 1950.000 LF 0024 L022.81 SILT CHECK, TYPE 1-HIGH 80.000 LF 0025 L032.75 MULCH 2.000 TON GROUP 6 BRIDGE AT STATION 15+00.00 0026 0030.60 MOBILIZATION 1.000 LUMP 0027 1010.01 EXCAVATION (ESTABLISHED QUANTITY) 611.000 CY