Specifications include, but are not limited to: THE PURPOSE OF THIS PROJECT IS TO WIDEN AND IMPROVE APPROXIMATELY 3.730 MILES OF HWY 67, CONSTRUCT TWO R.C. BOX CULVERTS, AND ONE CONTINUOUS W BEAM BRIDGE IN LONOKE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL OF ITEMS, FLOWABLE SELECT MATERIAL, EARTHWORK, TRENCHING AND SHOULDER PREPARATION, CONCRETE DITCH PAVING, AGGREGATE BASE COURSE, CEMENT STABILIZED CRUSHED STONE BASE, PORTLAND CEMENT CONCRETE PAVING, ACHM BASE, BINDER, AND SURFACE COURSES, COLD MILLING OF ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, APPROACH SLABS AND GUTTERS, MAINTENANCE OF TRAFFIC, MINOR DRAINAGE ITEMS, AWIS, GUARDRAIL, EROSION CONTROL, CONCRETE BARRIER WALL, NOISE BARRIER WALL, ITS ITEMS, RUMBLE STRIPS, PAVEMENT MARKINGS, TWO R.C. BOX CULVERTS (114.42'), ONE CONTINUOUS W BEAM BRIDGE (352.21'), AND OTHER MISC. ITEMS