Specifications include, but are not limited to: jointly construct new welded steel pipelines (WSP) that, when interconnected, will provide a resilient water supply and add additional capacity and flexibility to exchange water supplies between the two agencies both in the near and long term. The Project is comprised of three separate pipeline schedules that are interconnected to convey raw or finished water north or south: Cottonwoods Connector – Schedule 1 (CC-1), Salt Lake Aqueduct Replacement (SLAR), and Cottonwoods Connector – Schedule 2 (CC-2); relocations are required for the existing Salt Lake Aqueduct (SLA) and Little Cottonwood Conduit (LCC). The work included in this contract only includes steel pipe supply. Services, including the labor, equipment, and materials required to construct the proposed improvements, will be awarded by a separate contract to a General Contractor. The contract executed for pipe supply described in this advertisement will eventually be assigned to the contractor who is awarded the construction contract. The three (3) separate pipeline schedules are divided into the following six (6) packages (lengths are approximate, Drawings shall govern): 1. Schedule A-1 (CC-1 East): 2,665 linear feet (LF) of 36-inch diameter pipe 2. Schedule A-2 (CC-1 West): 1,900 LF of 36-inch diameter pipe 3. Schedule B (CC-2): 1,950 LF of 36-inch diameter pipe 4. Schedule C-1 (SLAR): 12,840 LF of 60-, 66-, and 72-inch diameter pipe 5. Schedule C-2 (SLA): 1,000 LF of 69-inch diameter pipe 6. Schedule C-3 (LCC): 1,120 LF of 36-inch diameter pipe