Specifications include, but are not limited to: Task 1 – Removal of Existing Pool Liner The Contractor will be expected to remove the existing pool liner prior to providing a new one. The Provider must a. Provide equipment and services required for erection and delivery onto the premises the equipment or apparatus required for the work. Remove equipment from premises when no longer required b. Provide protection for the pool decks, surrounding structures, and existing equipment during construction. c. Provide and maintain proper shoring and bracing for existing utilities and plumbing connections, as required. d. Remove of the existing pool liner and any backing from the previous liner. Task 2 – Liner Replacement The Contractor will provide a new PVC pool liner, with lane markings, wall targets, and resurfacing markers for the pool and gutters. The provider must a. Provide equipment and services required for erection and delivery onto the premises the equipment or apparatus required for the work. Remove equipment from premises when no longer required. b. Provide protection for the pool decks, surrounding structures, and existing equipment during construction. c. Provide and maintain proper shoring and bracing for existing utilities and plumbing connections, as required. d. Prepare the existing pool surfaces for the new liner and backing. e. Ensure required bonding and grounding of the pool shell and fittings. f. Provide and install shimming to re-level the rim flow gutter. g. Provide and install a PVC liner finish in the pool, and any backing required, to replace the existing liner and maintain the proper function of the pool and gutter system. h. Perform and pass a water tightness test, to ensure pool and gutters are watertight. i. Remove all equipment and protection used during the project from the premises. Clean the premises as required to restore the facility to the condition it was in when the Contractor took possession. j. Obtain final acceptance by jurisdictional health department, if required. k. Obtain final acceptance and sign off by the OWNER, or representative of the OWNER.