Specifications include, but are not limited to: The project is interior renovations to the central dining facility (DFAC) at Wendell H Ford Regional Training Center. The scope of the work will include providing an interior queuing area for patrons, renovations to the serving area, and replacement of floors, ceilings, lights and other finishes to update the facility. Materials will match existing. There will be minor cmu work, mostly patching of existing at demolished areas. New work will include gypboard on steel stud framing, vct flooring and suspended acoustic ceilings. A new entrance vestibule will be provided for the queuing area, enclosed with aluminum storefront and glazing. Exterior concrete walk will be removed/replaced as necessary for the new vestibule entrance. Plumbing scope includes removal of a mop basin and associated water, waste and vent lines, removal of floor drains as required and capping the waste below slab. New plumbing will include installation of a new mop sink and providing water/waste lines as required for beverage dispensers. The HVAC scope will consist of replacement of all ceiling supply diffusers and return grilles in the dining room spaces. Demolition will include removal of an exhaust fan/grille in the existing janitor's closet. Thermostats and sensors shall be relocated as required due to demolition of walls. The renovation area will receive replacement lighting to comply with the 2012 International Energy Code. New lighting will be LED. The renovation area will reuse the existing 120/208V, 3-phase, 4-wire power distribution system. Most circuits with be relocated with the load they serve. Category 6 UTP cable will be used for each new / altered voice and data drop. All cable will originate from patch panel terminations and extend via cable tray or j-hooks, and conduit to a termination at a face plate.