Specifications include, but are not limited to: The Project involves: removal of ground mounted, open wire, oil filled, distribution transformers serving Cell Houses #5, #4, and Distribution Panel MDP; Installation of a dead front, oil filled, 15 kV rated pad mounted transformer; 600 V Service Entrance Automatic Transfer Switch, and extension of 15kV and 600V rated circuits. Associated work of the Project includes, but is not limited to, trenching and backfill for installation of conduits, termination of circuits, removal of existing switchgear enclosure and modification of existing concrete pad to allow installation of pad mounted transformer and transfer switch. All work must be performed in a sequenced effort coordinated with the KSP. The work of the Project is outside the KSP security boundary.