Specifications include, but are not limited to: Coordination with Burlington Electric Department on best strategy for bringing electrical service to kiosk. • Coordination with City of Burlington Water Resources Department on all aspects of water/wastewater infrastructure. • A water resources design engineer shall provide a PE stamped design for the water service connection and sewer service connection at City Hall Park. Scope items at a minimum include: o Coordinate with the project team for the proposed city hall kiosk to complete water and sewer service design work. o Coordinate with City Water Resources engineering team to ensure the project is in conformance with city standards and expectations. o Coordinate with the City Department that will be operating the kiosk’s water utilities to ensure design and maintenance needs meet their expectations (such as winterization). o Water and sewer installation shall be in conformance with Burlington’s standard details. See this link and the Exhibit C for reference: https://www.burlingtonvt.gov/DPW/ConnectionRequirements o Review state Wastewater System and Potable Water Supply Permit requirements and complete permit application process for the project if it is required. Design flows are to be calculated by the design engineer and the City can provide a capacity to serve letter when they are complete. o The selected consultant shall confirm the existing water line in the park that is tapped for water service is adequate size and that the existing meter in the park is adequate size. Any changes to a water meter would need coordination with Metering Services. o The selected consultant shall provide construction oversight during the installation of buried water resources infrastructure. o The selected consultant shall provide record drawings at the end of construction. o The attached City Hall Park drawing is an excerpt of utilities present in the park. Additional record drawing and/or design drawing information will be shared if it is available and pertinent to the design. • Development of design documents for bringing water, wastewater and electrical connections to the site of the Kiosk as needed for coordination with Kiosk design team and permitting. Design to minimize disturbance to existing hardscape and plantings and to include repair/replacement of existing hardscape and plantings. • Complete design and submission of State water/wastewater permit (if required). • Development of construction documents and specifications for bidding of work. • Construction Administration as needed.